HOPEWORKS HOPEWORKS 3 - ChargePoint EV Charging Station in Everett
3315 Broadway, Everett, WA 98201
Connectors: CHAdeMO, CCS · Up to 62.5 kW
At a glance
Plug & Charge Details
- Max charging speed
- 62.5 kW
- Total plugs
- 1
- Pricing
- Unknown/Variable
1 DC Fast / 0 Level 2
What the speed means: This power level is suited to a meal or rest stop, though charging time depends heavily on the vehicle. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 3315 Broadway, Everett, WA 98201
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does HOPEWORKS HOPEWORKS 3 have NACS connectors?
No NACS connectors are currently listed for HOPEWORKS HOPEWORKS 3. Available connector types are CHAdeMO, CCS.
How much does it cost to charge at ChargePoint in Everett?
Pricing for HOPEWORKS HOPEWORKS 3 is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for HOPEWORKS HOPEWORKS 3 are 24 hours daily.
Other EV Chargers in Everett
Compare other listed charging options in the same city.
3615 Broadway, Everett, WA 98201
- Max speed
- 400 kW
- Total plugs
- 14
11802 Evergreen Way, Everett, WA 98204
- Max speed
- 400 kW
- Total plugs
- 12
Electrify America
Walmart 3053 (Everett, WA)
1605 SE Everett Mall Way, Everett, WA 98208
- Max speed
- 350 kW
- Total plugs
- 10
