PIE AE WEST LAKE DC 2 - ChargePoint EV Charging Station in Austin
701 S Capital of Texas Hwy, Austin, TX 78746
Connectors: CHAdeMO, CCS · Up to 125 kW
At a glance
Plug & Charge Details
- Max charging speed
- 125 kW
- Total plugs
- 1
- Pricing
- Unknown/Variable
1 DC Fast / 0 Level 2
What the speed means: This power level is suited to a meal or rest stop, though charging time depends heavily on the vehicle. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 701 S Capital of Texas Hwy, Austin, TX 78746
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does PIE AE WEST LAKE DC 2 have NACS connectors?
No NACS connectors are currently listed for PIE AE WEST LAKE DC 2. Available connector types are CHAdeMO, CCS.
How much does it cost to charge at ChargePoint in Austin?
Pricing for PIE AE WEST LAKE DC 2 is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for PIE AE WEST LAKE DC 2 are 24 hours daily.
Other EV Chargers in Austin
Compare other listed charging options in the same city.
Tesla Supercharger
Austin, TX - North Mopac Expressway - Tesla Supercharger
10515 N Mopac Expy, Austin, TX 78759
- Max speed
- 325 kW
- Total plugs
- 24
Tesla Supercharger
Austin, TX - Spirit of Texas Drive - Tesla Supercharger
2901 Spirit of Texas Dr, Austin, TX 78719
- Max speed
- 325 kW
- Total plugs
- 19
Mercedes-Benz High-Power Charging
Austin - The Domain MB.HPC
3210 Kramer Ln, Austin, TX 78758
- Max speed
- 400 kW
- Total plugs
- 9
