LBCC LBCC DUAL 4 - ChargePoint EV Charging Station in Lebanon
2000 W Oak St, Lebanon, OR 97355
Connectors: J1772 · Up to 11.5 kW
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- 11.5 kW
- Total plugs
- 2
- Pricing
- Unknown/Variable
0 DC Fast / 2 Level 2
What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 2000 W Oak St, Lebanon, OR 97355
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does LBCC LBCC DUAL 4 have NACS connectors?
No NACS connectors are currently listed for LBCC LBCC DUAL 4. Available connector types are J1772.
How much does it cost to charge at ChargePoint in Lebanon?
Pricing for LBCC LBCC DUAL 4 is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for LBCC LBCC DUAL 4 are 24 hours daily.
Other EV Chargers in Lebanon
Compare other listed charging options in the same city.
TurnOnGreen
Best Western Premier Boulder Falls Inn
505 Mullins Dr, Lebanon, OR 97355
- Max speed
- 11 kW
- Total plugs
- 2
ChargePoint
COMP-NORTHWEST COMP-NORTHWEST
200 Mullins Dr, Lebanon, OR 97355
- Max speed
- 7.7 kW
- Total plugs
- 2
Non-Networked
Linn-Benton Community College Lebanon Center
44 Industrial Way, Lebanon, OR 97355
- Max speed
- Not listed
- Total plugs
- 2
