Walmart EV Charging - Walmart EV Charging Station in Checotah
131 Paul Carr Dr, Checotah, OK 74426
Connectors: CCS, NACS · Up to 400 kW
At a glance
Plug & Charge Details
- Max charging speed
- 400 kW
- Total plugs
- 8
- Pricing
- $0.53 per kWh
8 DC Fast / 0 Level 2
What the speed means: This is a high-power DC fast-charging location. Compatible vehicles may add substantial range during a short stop. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 131 Paul Carr Dr, Checotah, OK 74426
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
- Restrooms
- Shopping
- Dining
Common questions
Frequently Asked Questions
Does Walmart EV Charging have NACS connectors?
Yes. Walmart EV Charging lists NACS connectors among its available plug types.
How much does it cost to charge at Walmart in Checotah?
The listed pricing for Walmart EV Charging is: $0.53 per kWh. Confirm the current rate in the Walmart app or at the charger before starting a session.
Is this charger open 24/7?
Yes. The reported access hours for Walmart EV Charging are 24 hours daily.
Other EV Chargers in Checotah
Compare other listed charging options in the same city.
EVgo
Flying J 702
1255 Gentry, Checotah, OK 74426
- Max speed
- 350 kW
- Total plugs
- 4
