150 kW
Level 3 DC Fast8
8 fast / 0 L2
OH local charging directory
Compare 12 public locations by plug type, reported charging power, network, access hours, pricing, and driving directions.
active public locations
22 Level 2
at 2 locations
1 locations at 150 kW+
Local snapshot
The public charging inventory in Grove City includes 32 plugs across 12 locations. 2 stations offer DC fast charging, representing about 17% of listed locations. For longer stops, the directory contains 22 Level 2 plugs.
The most widely represented connector types include J1772, NACS, CCS. Compatibility matters as much as proximity: select your vehicle’s connector below, then compare reported power and plug count before choosing a stop.
12 locations report 24-hour access and 1 are described as free or complimentary. Access, fees, and live availability can change, so confirm critical trip stops in the charging network’s app.
Refine the results
Open the station search with Grove City and OH already selected, then combine plug, network, speed, and access filters.
Station directory
Locations are ordered using reported charging power, fast-plug count, connector choice, access hours, and amenities. This is a planning score, not a live reliability ranking.
150 kW
Level 3 DC Fast8
8 fast / 0 L2
120 kW
Level 3 DC Fast2
2 fast / 0 L2
12 kW
Level 24
0 fast / 4 L2
10 kW
Level 22
0 fast / 2 L2
6.5 kW
Level 22
0 fast / 2 L2
6.5 kW
Level 22
0 fast / 2 L2
6.5 kW
Level 22
0 fast / 2 L2
6.5 kW
Level 22
0 fast / 2 L2
6.5 kW
Level 22
0 fast / 2 L2
6.5 kW
Level 22
0 fast / 2 L2
6.5 kW
Level 22
0 fast / 2 L2
Not listed
Level 22
0 fast / 2 L2
Local operators
Location counts show directory coverage, not real-time uptime or plug availability.
Connector coverage
Planning answers
This directory currently lists 12 active public charging locations in Grove City, Ohio, with 32 reported Level 2 and DC fast plugs.
Yes. 2 locations list DC fast charging, with 10 fast plugs in total. The fastest reported station power is 150 kW.
ChargePoint has the largest presence in the current directory, with 7 listed locations. Network coverage does not indicate live charger availability.
12 listed locations report 24-hour access—about 100% of the city directory. Confirm access rules and live status with the network before arrival.