Evoke Systems charging location
Van Bortel Chevrolet L3 - Front Of Lot - Evoke Systems EV Charging Station in Macedon
1 W Main St, Macedon, NY 14502
Connectors: CCS · Up to 120 kW
At a glance
Plug & Charge Details
- Connectors available
- CCS
- Max charging speed
- 120 kW
- Total plugs
- 2
- Pricing
- $2 initiation fee; $0.30 per kWh; $10 per hour idle fee
2 DC Fast / 0 Level 2
What the speed means: This power level is suited to a meal or rest stop, though charging time depends heavily on the vehicle. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 1 W Main St, Macedon, NY 14502
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does Van Bortel Chevrolet L3 - Front Of Lot have NACS connectors?
No NACS connectors are currently listed for Van Bortel Chevrolet L3 - Front Of Lot. Available connector types are CCS.
How much does it cost to charge at Evoke Systems in Macedon?
The listed pricing for Van Bortel Chevrolet L3 - Front Of Lot is: $2 initiation fee; $0.30 per kWh; $10 per hour idle fee. Confirm the current rate in the Evoke Systems app or at the charger before starting a session.
Is this charger open 24/7?
Yes. The reported access hours for Van Bortel Chevrolet L3 - Front Of Lot are 24 hours daily.
Other EV Chargers in Macedon
Compare other listed charging options in the same city.
AmpUp
Town Hall of Macedon
32 W Main St, Macedon, NY 14502
- Max speed
- 7.6 kW
- Total plugs
- 1
ChargePoint
19 W MAIN 19 W MAIN EV
19 W Main St, Macedon, NY 14502
- Max speed
- 6.5 kW
- Total plugs
- 2
Non-Networked
Van Bortel Chevrolet
1338 Pittsford Palmyra Rd, Macedon, NY 14502
- Max speed
- Not listed
- Total plugs
- 2
