Skip to content
US EV Charging Stations

Non-Networked charging location

Metro Lighting - Non-Networked EV Charging Station in Brentwood

929 Hanley Industrial Ct, Brentwood, MO 63144

Connectors: J1772

Level 2

At a glance

Plug & Charge Details

Connectors available
J1772
Max charging speed
Not listed
Total plugs
1

0 DC Fast / 1 Level 2

Pricing
Free

What the speed means: Maximum power has not been reported, so check the network app or charger before relying on a specific charging time. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.

Plan your stop

Location & Directions

Address
929 Hanley Industrial Ct, Brentwood, MO 63144
Access hours
24 hours daily

While you charge

Nearby Amenities

  • Restrooms
  • Shopping
  • Dining

Common questions

Frequently Asked Questions

Does Metro Lighting have NACS connectors?

No NACS connectors are currently listed for Metro Lighting. Available connector types are J1772.

How much does it cost to charge at Non-Networked in Brentwood?

The listed pricing for Metro Lighting is: Free. Confirm the current rate in the Non-Networked app or at the charger before starting a session.

Is this charger open 24/7?

Yes. The reported access hours for Metro Lighting are 24 hours daily.

Other EV Chargers in Brentwood

Compare other listed charging options in the same city.