Non-Networked charging location
Western Michigan University - West Parking Structure Lower Level - Non-Networked EV Charging Station in Kalamazoo
CEAS W Parking Deck, Kalamazoo, MI 49008
Connectors: J1772
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- Not listed
- Total plugs
- 1
- Pricing
- Unknown/Variable
0 DC Fast / 1 Level 2
What the speed means: Maximum power has not been reported, so check the network app or charger before relying on a specific charging time. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- CEAS W Parking Deck, Kalamazoo, MI 49008
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does Western Michigan University - West Parking Structure Lower Level have NACS connectors?
No NACS connectors are currently listed for Western Michigan University - West Parking Structure Lower Level. Available connector types are J1772.
How much does it cost to charge at Non-Networked in Kalamazoo?
Pricing for Western Michigan University - West Parking Structure Lower Level is unknown or variable. Check the Non-Networked app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for Western Michigan University - West Parking Structure Lower Level are 24 hours daily.
Other EV Chargers in Kalamazoo
Compare other listed charging options in the same city.
Non-Networked
West Michigan International
5380 International Dr, Kalamazoo, MI 49009
- Max speed
- 480 kW
- Total plugs
- 4
Red E Charge
DeNooyer Chevrolet Kalamazoo
5800 Stadium Drive, Kalamazoo, MI 49009
- Max speed
- 174.7 kW
- Total plugs
- 2
ChargePoint
SEELYE SEELYE FAST
3820 Stadium Drive, Kalamazoo, MI 49008
- Max speed
- 120 kW
- Total plugs
- 2
