BLUE ENERGY 1 BEACON PARK DC2 - ChargePoint EV Charging Station in Detroit
1971 Grand River Ave, Detroit, MI 48226
Connectors: CHAdeMO, CCS · Up to 62.5 kW
At a glance
Plug & Charge Details
- Max charging speed
- 62.5 kW
- Total plugs
- 1
- Pricing
- Unknown/Variable
1 DC Fast / 0 Level 2
What the speed means: This power level is suited to a meal or rest stop, though charging time depends heavily on the vehicle. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 1971 Grand River Ave, Detroit, MI 48226
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does BLUE ENERGY 1 BEACON PARK DC2 have NACS connectors?
No NACS connectors are currently listed for BLUE ENERGY 1 BEACON PARK DC2. Available connector types are CHAdeMO, CCS.
How much does it cost to charge at ChargePoint in Detroit?
Pricing for BLUE ENERGY 1 BEACON PARK DC2 is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for BLUE ENERGY 1 BEACON PARK DC2 are 24 hours daily.
Other EV Chargers in Detroit
Compare other listed charging options in the same city.
Tesla Supercharger
Detroit, MI - Tesla Supercharger
1301 8 Mile Rd, Detroit, MI 48203
- Max speed
- 325 kW
- Total plugs
- 20
Red E Charge
Trumbull Ave Mobil
5001 Trumbull St, Detroit, MI 48208
- Max speed
- 480 kW
- Total plugs
- 2
1205 W. 8 Mile Rd., Detroit, MI 48203
- Max speed
- 350 kW
- Total plugs
- 4
