MT WACHUSETT CC MWCC STA 1 - ChargePoint EV Charging Station in Gardner
444 Green St, Gardner, MA 01440
Connectors: J1772 · Up to 6.5 kW
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- 6.5 kW
- Total plugs
- 2
- Pricing
- Unknown/Variable
0 DC Fast / 2 Level 2
What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 444 Green St, Gardner, MA 01440
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does MT WACHUSETT CC MWCC STA 1 have NACS connectors?
No NACS connectors are currently listed for MT WACHUSETT CC MWCC STA 1. Available connector types are J1772.
How much does it cost to charge at ChargePoint in Gardner?
Pricing for MT WACHUSETT CC MWCC STA 1 is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for MT WACHUSETT CC MWCC STA 1 are 24 hours daily.
Other EV Chargers in Gardner
Compare other listed charging options in the same city.
ChargePoint
SALVADORE AUTO SALVADOR L3 B
442 West Broadway, Gardner, MA 01440
- Max speed
- 400 kW
- Total plugs
- 2
ChargePoint
SALVADORE AUTO SALVADORE L3 A
442 West Broadway, Gardner, MA 01440
- Max speed
- 400 kW
- Total plugs
- 2
ChargePoint
NOURIA GARDNER 1
264 Timpany Boulevard, Gardner, MA 01440
- Max speed
- 319.2 kW
- Total plugs
- 1
