COUNTY COMPLEX INNOVATION 2 - ChargePoint EV Charging Station in Barnstable
3195 Main St, Barnstable, MA 02630
Connectors: J1772 · Up to 6.5 kW
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- 6.5 kW
- Total plugs
- 2
- Pricing
- Unknown/Variable
0 DC Fast / 2 Level 2
What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 3195 Main St, Barnstable, MA 02630
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does COUNTY COMPLEX INNOVATION 2 have NACS connectors?
No NACS connectors are currently listed for COUNTY COMPLEX INNOVATION 2. Available connector types are J1772.
How much does it cost to charge at ChargePoint in Barnstable?
Pricing for COUNTY COMPLEX INNOVATION 2 is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for COUNTY COMPLEX INNOVATION 2 are 24 hours daily.
Other EV Chargers in Barnstable
Compare other listed charging options in the same city.
ChargePoint
MASSDOT BARN EXP #2
2145 Iyannough Road, Barnstable, MA 02668
- Max speed
- 320 kW
- Total plugs
- 2
ChargePoint
MASSDOT EXP #1
2145 Iyannough Road, Barnstable, MA 02668
- Max speed
- 320 kW
- Total plugs
- 2
ChargePoint
PCCJEEP PL-3-R
556 Yarmouth Rd, Barnstable, MA 02601
- Max speed
- 280 kW
- Total plugs
- 2
