Skip to content
US EV Charging Stations

ChargePoint charging location

ALLAGASH BREWIN ALLAGASH-TR - ChargePoint EV Charging Station in Portland

50 Industrial Way, Portland, ME 04103

Connectors: J1772 · Up to 6.5 kW

Level 2

At a glance

Plug & Charge Details

Connectors available
J1772
Max charging speed
6.5 kW
Total plugs
2

0 DC Fast / 2 Level 2

Pricing
Unknown/Variable

What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.

Plan your stop

Location & Directions

Address
50 Industrial Way, Portland, ME 04103
Access hours
24 hours daily

While you charge

Nearby Amenities

Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.

Common questions

Frequently Asked Questions

Does ALLAGASH BREWIN ALLAGASH-TR have NACS connectors?

No NACS connectors are currently listed for ALLAGASH BREWIN ALLAGASH-TR. Available connector types are J1772.

How much does it cost to charge at ChargePoint in Portland?

Pricing for ALLAGASH BREWIN ALLAGASH-TR is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.

Is this charger open 24/7?

Yes. The reported access hours for ALLAGASH BREWIN ALLAGASH-TR are 24 hours daily.

Other EV Chargers in Portland

Compare other listed charging options in the same city.