Building 2 - ChargeUP EV Charging Station in Sandford
2985 Railside Loop, Sandford, FL 32711
Connectors: J1772 · Up to 7.6 kW
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- 7.6 kW
- Total plugs
- 2
- Pricing
- Unknown/Variable
0 DC Fast / 2 Level 2
What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 2985 Railside Loop, Sandford, FL 32711
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does Building 2 have NACS connectors?
No NACS connectors are currently listed for Building 2. Available connector types are J1772.
How much does it cost to charge at ChargeUP in Sandford?
Pricing for Building 2 is unknown or variable. Check the ChargeUP app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for Building 2 are 24 hours daily.
