Bristol Lake Apartments - ChargeUP EV Charging Station in Mount Dora
2500 Peaceful River Drive, Mount Dora, FL 32757
Connectors: J1772 · Up to 7.6 kW
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- 7.6 kW
- Total plugs
- 8
- Pricing
- Unknown/Variable
0 DC Fast / 8 Level 2
What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 2500 Peaceful River Drive, Mount Dora, FL 32757
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does Bristol Lake Apartments have NACS connectors?
No NACS connectors are currently listed for Bristol Lake Apartments. Available connector types are J1772.
How much does it cost to charge at ChargeUP in Mount Dora?
Pricing for Bristol Lake Apartments is unknown or variable. Check the ChargeUP app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for Bristol Lake Apartments are 24 hours daily.
Other EV Chargers in Mount Dora
Compare other listed charging options in the same city.
ChargeUP
Donnelly Park
130 East 6th Avenue, Mount Dora, FL 32757
- Max speed
- 7.6 kW
- Total plugs
- 1
ChargeUP
East Third Avenue
107 East Third Ave, Mount Dora, FL 32757
- Max speed
- 7.6 kW
- Total plugs
- 1
ChargePoint
EUDORA RESERVE STATION 1
2796 Spring Orchard Ave., Mount Dora, FL 32757
- Max speed
- 6.5 kW
- Total plugs
- 2
