Pikes Peak Regional Building Department - Loop EV Charging Station in Colorado Springs
3939 Cordera Crest Ave, Colorado Springs, CO 80924
Connectors: J1772 · Up to 7.7 kW
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- 7.7 kW
- Total plugs
- 2
- Pricing
- $1 activation fee; $0.20 per kWh
0 DC Fast / 2 Level 2
What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 3939 Cordera Crest Ave, Colorado Springs, CO 80924
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does Pikes Peak Regional Building Department have NACS connectors?
No NACS connectors are currently listed for Pikes Peak Regional Building Department. Available connector types are J1772.
How much does it cost to charge at Loop in Colorado Springs?
The listed pricing for Pikes Peak Regional Building Department is: $1 activation fee; $0.20 per kWh. Confirm the current rate in the Loop app or at the charger before starting a session.
Is this charger open 24/7?
Yes. The reported access hours for Pikes Peak Regional Building Department are 24 hours daily.
Other EV Chargers in Colorado Springs
Compare other listed charging options in the same city.
Walmart
Walmart EV Charging
8250 Razorback Rd, Colorado Springs, CO 80920
- Max speed
- 400 kW
- Total plugs
- 8
Walmart
Walmart EV Charging
5550 E Woodmen Rd, Colorado Springs, CO 80920
- Max speed
- 400 kW
- Total plugs
- 8
Tesla Supercharger
Colorado Springs, CO - E Tyler St - Tesla Supercharger
2727 N Cascade Ave, Colorado Springs, CO 80907
- Max speed
- 325 kW
- Total plugs
- 12
