111 BUILDING STATION 1 - ChargePoint EV Charging Station in Rancho Mirage
72027 CA-111, Rancho Mirage, CA 92270
Connectors: J1772 · Up to 6.5 kW
At a glance
Plug & Charge Details
- Connectors available
- J1772
- Max charging speed
- 6.5 kW
- Total plugs
- 2
- Pricing
- Unknown/Variable
0 DC Fast / 2 Level 2
What the speed means: This power level is generally best for a longer stop or destination charging. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 72027 CA-111, Rancho Mirage, CA 92270
- Access hours
- 24 hours daily
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does 111 BUILDING STATION 1 have NACS connectors?
No NACS connectors are currently listed for 111 BUILDING STATION 1. Available connector types are J1772.
How much does it cost to charge at ChargePoint in Rancho Mirage?
Pricing for 111 BUILDING STATION 1 is unknown or variable. Check the ChargePoint app or the charger screen for the current session price.
Is this charger open 24/7?
Yes. The reported access hours for 111 BUILDING STATION 1 are 24 hours daily.
Other EV Chargers in Rancho Mirage
Compare other listed charging options in the same city.
42370 Bob Hope Dr, Rancho Mirage, CA 92270
- Max speed
- 350 kW
- Total plugs
- 10
36101 Bob Hope Drive, Rancho Mirage, CA 92270
- Max speed
- 350 kW
- Total plugs
- 8
Tesla Supercharger
Rancho Mirage, CA - Tesla Supercharger
71800 CA-111, Rancho Mirage, CA 92270
- Max speed
- 75 kW
- Total plugs
- 24
