US Bank Coronado - EVCS EV Charging Station in Coronado
800 Orange Ave, Coronado, CA 92118
Connectors: CHAdeMO, CCS · Up to 50 kW
At a glance
Plug & Charge Details
- Max charging speed
- 50 kW
- Total plugs
- 1
- Pricing
- Unknown/Variable
1 DC Fast / 0 Level 2
What the speed means: This power level is suited to a meal or rest stop, though charging time depends heavily on the vehicle. Actual charging speed depends on vehicle limits, battery temperature, state of charge, power sharing, and charger availability.
Plan your stop
Location & Directions
- Address
- 800 Orange Ave, Coronado, CA 92118
- Access hours
- Hours not reported
While you charge
Nearby Amenities
Nearby amenities have not been reported for this location. Check the map before arriving if you need food, restrooms, shopping, or lodging during your charge.
Common questions
Frequently Asked Questions
Does US Bank Coronado have NACS connectors?
No NACS connectors are currently listed for US Bank Coronado. Available connector types are CHAdeMO, CCS.
How much does it cost to charge at EVCS in Coronado?
Pricing for US Bank Coronado is unknown or variable. Check the EVCS app or the charger screen for the current session price.
Is this charger open 24/7?
The reported access hours are Hours not reported. Check site access before making a special trip.
Other EV Chargers in Coronado
Compare other listed charging options in the same city.
EVgo
Vons Coronado
868 Orange Ave, Coronado, CA 92118
- Max speed
- 350 kW
- Total plugs
- 4
1825 Strand Way, Coronado, CA 92118
- Max speed
- 19.3 kW
- Total plugs
- 2
Blink
Coronado Point
1101 First St, Coronado, CA 92118
- Max speed
- 17 kW
- Total plugs
- 1
